Monday, August 30, 2010

Facilities / Attractions in BTM Surrounding

BTM Wet Market




BTM Shop Lots




BTM's Pondok




BTM Police Station




Petrol Station




BTM Developer's Office




Nice View of the Main Road




Banks - Maybank, Public Bank




"Mata" Meronda




JV Hotel @ BTM




Klinik Kesihatan @ BTM





Fly Over




Plenty of Kindergartens @ BTM




Plenty of Restaurants @ BTM
1. 源顺利茶餐室 - Restoran Yen Soonly
2. 龙马饮食中心 - Restoran Rong Mah
3. 好吃街饮食中心 - Restoran Chiat Kieh
4. 新海香海鲜楼有限公司 - Hai Siang Seafood Sdn. Bhd.
5. 合家欢饮食中心 - Restoran Hakka Wan

Updated BTM Phase 8E (30August10)

Monday (30August) purposely took leave and went to BTM to snap shoot some photos and to see the progress of BTM phase 8E.Below are some photos for sharing.
Just talked to the sales person, the new Phase 8F (Double-storey teres house) will be going to launch @ early of October. Price around RM230K. Besides that, BTM also going to launch new phase 7B (near Boon Beng school) which is Semi-D and the price is around RM350K.


Show house - No change. Need to make appointment with the sales person if you want to view/visit the show house.



Contact person - These are the sales person's contact numbers.



The progress of the constructions looks good!



Pipe underneath the car park.



Mini garden @ car park



Peeking inside the house :)



The "tiang" is actually not totally @ the center between 2 houses.



Small lane separate into 2 rows.



Overview



The lane segregates the phase 8E and 8D



Phase 8D



Phase 8E's backyard will be looks like this - No renovation.



Phase 8E's backyard will be looks like this - Extended renovation.

槟城第二大桥工程进展(August2010)

峇都茅(Batu Maung)开始安装承台(pile Cap)和墩台(Pier)



1.* 中国港湾公司开始安装承台和墩台,同时已打入近2700根桩,海上工程进展相信已超过50%。
2.* 槟城第二大桥工程需要打约5000根桩,平均每个月必须打入超过100根桩。
3.* 一旦完工之后,马友乃德(UEM Group)即可开始展开工程进展。
4.* 槟城第二大桥需要安装大约接近300个承台。由于槟城第二大桥的承台和墩台是安装在海面上,所以人民是无法在陆地上看到工程进行,唯有在海上进行活动的渔民才能亲眼目睹第二大桥的新工程进展。
5.* 马友乃德在峇都加湾(Batu Kawan)的桥梁桥身铸(Casting)造工厂,每个月需要生产336个箱梁 (Segmental box girdle)。槟城第二大桥共需要8100箱梁。

6.* 城第二大桥工程共分为4个阶段进行,
- 第1阶段是:制造靠近峇都茅的引桥、主桥东侧高墩区及主桥,需耗时接近3年半的时间 (construction of the sub-structure such as piling and the building of pile caps, columns and the navigation span by CHEC Construction Sdn Bhd (the local arm of China Harbour Engineering Co Ltd));

- 第2阶段:衔接高墩区部份,需耗时逾2年的时间 (casting of the segmental box girdle by UEM Builders Bhd);

- 第3阶段是峇都加湾处引桥,需要31个月的时间 (construction of the Batu Kawan and Batu Maung exit and entry points and trumpet interchange by Cergas Murni, IJM Construction and HRA Teguh)。

- 而第4阶段: 第4个阶段为收费站暂时还未确定承包商。


7.* 林冠英当时提及,据第二桥有限公司汇报,槟城第二大桥工程从原本的2012年12月展延至2013年9月才竣工,共有6个因素所致,包括测试槟城第二桥的撞击力、地震后测试、挖深海床、二桥承接问题、确保中国港湾有限公司及马友乃德双方的整合工作及施工行道阻碍。

8.* 槟城第二大桥全长约23.5公里,为东南亚最长大桥,备有海运桥、高速大道、交流道、收费站及休息站。第二大桥的建材可兴建8座光大,或者45座具国际水平的足球场。



An artist’s impression of the new 24km link, which mirrors the existing Penang bridge in design.



Heavy machinery in operation at the bridge site at Seberang Perai.



铸模厂 (Casting yard @ Batu Kawan by UEM)



A UEM staff briefing Lim Guan Eng (right) at the Batu Kawan casting yard, during an inspection by the Penang Chief Minister last year.



箱梁 (Segmental box girdle)



打桩台 (Piling Station)



打桩工程 (Pilling work)



1. http://www.kwongwah.com.my/news/2010/07/24/17.html
2. http://thestar.com.my/lifestyle/story.asp?file=/2010/8/29/lifefocus/6936885&sec=lifefocus

Saturday, August 28, 2010

光华日報 (Kwong Wah Yit Poh, 18th Jul 2010)


http://www.btm.com.my/popWin.html?p=imgs/news/100718kw00.jpg

Sunday, August 1, 2010

Updated BTM Phase 8E (31July10)

这些相片是我刚从BTM Phase 8E那拍的。1st Row的已经有50%的“样子“了,2nd Row 也慢慢起着了。
昨天刚给头期。Sales Person,Jackie 跟我讲after 2-8-10 (Monday), Phase 8E又要起多RM2K, 变成RM215,800(Minimum)。
Start soft launch (RM205,800)--> RM208,800 -->RM213,800 -->RM215,800 (within一年)
现在BTM Phase 8E 只剩下大概12units而已.要买请乘早!
Jackie还跟我讲在September那时又要launch新的phase,大概卖RM238K-RM240K.

















View from the House


2nd Row


文明小学